Mid week visits.

And then THIS happened….

Yesterday afternoon we took a trip out to the Farm, to have a look at how the floor had cleaned up.
We’d also scored a bargain of a whole pile of ceramic pots of various sizes – at $20 for them all, so the back of the truck was full of them, and they needed to be dropped off – as nothing else could go in the truck, until they were out.
There were a LOT!

As we went to pull into our driveway – there was a glorious sight to behold.
Pretty sure we heard a chorus of angel singing and harps being strummed actually!
Justin (remember our Electrician?) had been on site, and had started running the power cable!!!
WhooootWhoooot!!! More happy dancing!!

What an awesome surprize!

We hadn’t expected ANY headway in that department until Monday at the very earliest, so the fact that things were already under-way – was/IS very exciting :)))

It didn’t even dampen the mood that the floor still looks like shit – and will definitely need another good solid going over.
In our wisdom though – we are going to wait until the power and water are connected – so we have a little more of a fighting chance of doing a more decent job next time round…..lol.

About 140m of cable = which will bring power from the road to our shed, laid out ready for the trenching.
About 140m of cable – which will bring power from the road to our shed, laid out ready for the trenching.

 

image
And there we have it – power at our ‘front door’! SUPER EXCITING!!

 

we'd LOVE to hear from you!